Real projects, real results – see how we get it done.
Geebung Rail Station Upgrade
Newnham Scaffolding’s team worked diligently to safely fit falsework scaffolding during construction of the overpass bridge at Brisbane’s Geebung Train Station.
The Dakabin Road Bridge project required Newnham Scaffolding’s experienced team to design, source, and construct specifically engineered falsework scaffolding for the bridge’s headstocks.
Working at height above water was the primary risk when Newnham’s multi-skilled team provided customised and innovative scaffolding support to the Brisbane City Ferry Terminal Replacement project.
The O’keefe Street project was a comprehensive scaffolding job that saw Newnham Scaffolding project manage, design, supply and install scaffolding for 91 apartments across eight storeys.
Newport, Hamilton Reach is a 5 story building with 34 luxury apartments on the Brisbane River constructed by Tomkins Commercial and Industrial builders.
Soko Waterfront Apartments in West End is an 8 story apartment building with 2 levels of Basement, it has 120 apartments and is situated on the Brisbane River.
Newnham Scaffolding supplied scaffolding, labour and transport to complete a 20m wide by 50m long by 13m high Birdcage inside the Sunnybank Hills Shoppingtown.
The new Mercedes-Benz Brisbane is a permanent pop ups showroom plus café and restaurant occupying 4 levels on the existing 22 story building at 300 Adelaide Street, Brisbane.
As part of the Engineering Applications project, Newnham’s seasoned crew travelled to Gove in the Northern Territory to build hung, cantilevered and drop scaffolding during scheduled shutdowns.