Soko Apartments, West End

Soko Waterfront Apartments in West End is an 8 story apartment building with 2 levels of Basement, it has 120 apartments and is situated on the Brisbane River.

Our scaffolding package included the supply of all drawings and required engineering, the supply of our own quality and experienced labour, transport using our Moffatt trucks and hire of quality galvanised scaffolding.

While the job was still in the ground, we supplied pile cap hand railing, craneable stretcher stairs and general access and working decks for other trades. Once the podium was poured we supplied the building perimeter scaffolding, internal lift shafts, roof edge protection, loading bays and handrails to live edges. The job was completed ahead of program, safely and efficiently. Civic Construction and Newnham Scaffolding have continued to work together on other developments.

Soko Apartments, West End
Duncan Street, West End
Civic Construction Group Pty Ltd
$500,000 to $750,000
2016 - 2017
Commercial

Don’t just take our word for it. The proof is in our projects.

“After completing over 15 large scale commercial projects together in 4 years, I would highly recommend Newnham Scaffolding for their exceptional work and professionalism. Over the course of our relationship, they have proven to be a trusted partner, always providing clear communication, and delivering quality results. Their commitment to building strong relationships and their dedication to safety & presentation make them a standout on any project. I'm confident they will continue to deliver outstanding work and foster long lasting partnerships.”

Brendan Dale
Managing Director | Mosaic Constructions

“I have no hesitation in recommending Newnham Scaffolding to any prospective organisation requiring the services of a scaffolding company that can think outside of the box to both develop a unique concept on a difficult project and then to successfully manage it through to completion.”

Sead Jukic
Foreman | BMD Constructions

Newnham Scaffolding were the only company consulted that were able to develop a suitable concept and ultimately erect the above mentioned scaffolding. The works were completed both within the required timeframes and in a safe, well executed manner as detailed in their SWMS."

Peter Leech
Project Manager | Shape

“Newnham Scaffolding have worked in with other trades onsite, provided quality labour and foreman, worked in a professional manner, maintained or bettered our program durations, worked in with our estimators to assist in project procurement, assisted with methodology and work in a safe manner.”

Jeremy McKenzie
General Manager | Total Construction

“I wanted to express my gratitude/feedback to the entire Newnham Scaffolding team for their exceptional effort in the timely and efficient erection of the scaffold. The team's dedication to meeting deadlines thus far has been awesome with clear and open communication throughout the process is truly great. Hope this helps towards any overruns.”

John Covic
Site Manager | Azure